1020, 10th Floor, Gaur City Office Spaces, Sector-4, Greater Noida, Uttar Pradesh-201318
Powering A Sustainable Tomorrow
Step 1: Project Inputs

Tell Us About Your Site

₹5,00,000
₹2,000/mo ₹25 lakh/mo ₹50 lakh/mo
Use the per-unit energy charge from your electricity bill; adjust this to match your tariff.
30,000 sq ft
500 sq ft 100,000 sq ft 250,000+ sq ft
Planning assumptions

For planning, the model treats 80% of the monthly bill as energy charges, uses 1,500 kWh per kWp/year, targets solar generation at 80% of estimated site demand, and applies an indicative rooftop EPC budget of ₹45,000–₹70,000 per kWp depending on facility type. No subsidy, battery, financing, export credit or tax benefit is assumed.

25-year gross savings assume 3% annual tariff escalation and 0.5% annual panel degradation; they exclude O&M and financing costs. Actual generation, tariffs and turnkey prices vary by location, roof condition, DISCOM rules, equipment and scope. This is a preliminary estimate, not a vendor quote.

Step 2: Indicative Estimate

Solar Project Snapshot

Estimates update with your bill, energy tariff, facility type and usable site area.

Recommended System
285 kWp
Annual Clean Yield
433 MWh/yr
Indicative Project Budget
₹1.35–₹1.80 Cr
Estimated First-Year Bill Savings
₹—
Modeled 25-Year Gross Bill Savings
₹—
Estimated CO₂ Avoided
167 Tons/yr
Simple payback (before financing / subsidy): — Years

Need a site-specific assessment? Share your details and the assumptions above with our team.

Request a Project Assessment
Engineering Consultation

Request Your Custom Engineering Feasibility Proposal

Submit your contact details to discuss a site-specific system design, budget and savings estimate. Final project pricing requires a site and scope review.

Your feasibility study request was received! An energy engineer will contact you shortly.
Please fill in the required fields to submit.
Securely stored and processed in MongoDB. No spam, ever.